{"id":62884,"date":"2017-08-23T17:01:11","date_gmt":"2017-08-23T17:01:11","guid":{"rendered":"http:\/\/192.168.64.2\/fr\/index.php\/2017\/08\/23\/aleg-atelier-de-validation-du-trace-de-la-grande-muraille-verte\/"},"modified":"2022-07-04T15:21:07","modified_gmt":"2022-07-04T15:21:07","slug":"aleg-atelier-de-validation-du-trace-de-la-grande-muraille-verte","status":"publish","type":"post","link":"https:\/\/ami.mr\/fr\/archives\/62884","title":{"rendered":"Aleg : Atelier de validation du trac\u00e9 de la grande muraille verte"},"content":{"rendered":"<p>Les travaux d\u2019un atelier de validation du trac\u00e9 de la grande muraille verte (GMV) au niveau de la wilaya du Brakna, organis\u00e9 par le minist\u00e8re de l\u2019Environnement et du D\u00e9veloppement durable, ont d\u00e9marr\u00e9 mardi soir \u00e0 Aleg.<\/p>\n<p>A cette occasion, le secr\u00e9taire g\u00e9n\u00e9ral du minist\u00e8re de l\u2019Environnement et du D\u00e9veloppement durable, M. Mady Ould Taleb, a indiqu\u00e9 que l\u2019objectif est de franchir un pas concret de plus dans la dynamisation de la construction de cette grand muraille verte.<\/p>\n<p>Il a ajout\u00e9 que la validation du trac\u00e9 au niveau de la wilaya du Brakna va permettre le reboisement et la transformation en espaces de production et de d\u00e9veloppement durable de tr\u00e8s grandes \u00e9tendues arides, tout en limitant les effets n\u00e9gatifs des changements climatiques.<\/p>\n<p>De son c\u00f4t\u00e9, le directeur g\u00e9n\u00e9ral de la GMV, M. Sidi Mohamed Ould Lehlou, a fait expos\u00e9 sur l\u2019\u00e9tude pr\u00e9sent\u00e9e aux participants \u00e0 l\u2019atelier pour discussion et validation.<\/p>\n<p>Des communes et des localit\u00e9s de la wilaya du Brakna comme Aghchorguitt, Aleg, Cheggar, Maghta-Lahjar, Sangrava et Wad Amour vont profiter de cet important projet de Grande Muraille verte.<\/p>\n<p>La c\u00e9r\u00e9monie d\u2019ouverture de cet atelier de deux jours s\u2019est d\u00e9roul\u00e9e en pr\u00e9sence du wali du Brakna, M. Abderrahmane Ould Mahfoudh Ould Khattry, des hakem des moughataas d\u2019Aleg et de Maghta-Lahjar et des responsables des services techniques r\u00e9gionaux.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Les travaux d\u2019un atelier de validation du trac\u00e9 de la grande muraille verte (GMV) au niveau de la wilaya du Brakna, organis\u00e9 par le minist\u00e8re de l\u2019Environnement et du D\u00e9veloppement durable, ont d\u00e9marr\u00e9 mardi soir \u00e0 Aleg<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8672],"tags":[62481,62750],"class_list":["post-62884","post","type-post","status-publish","format-standard","hentry","category-8672","tag-aleg","tag-munina"],"_links":{"self":[{"href":"https:\/\/ami.mr\/fr\/wp-json\/wp\/v2\/posts\/62884","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ami.mr\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ami.mr\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ami.mr\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ami.mr\/fr\/wp-json\/wp\/v2\/comments?post=62884"}],"version-history":[{"count":1,"href":"https:\/\/ami.mr\/fr\/wp-json\/wp\/v2\/posts\/62884\/revisions"}],"predecessor-version":[{"id":157728,"href":"https:\/\/ami.mr\/fr\/wp-json\/wp\/v2\/posts\/62884\/revisions\/157728"}],"wp:attachment":[{"href":"https:\/\/ami.mr\/fr\/wp-json\/wp\/v2\/media?parent=62884"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ami.mr\/fr\/wp-json\/wp\/v2\/categories?post=62884"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ami.mr\/fr\/wp-json\/wp\/v2\/tags?post=62884"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}