{"id":18610,"date":"2024-08-14T15:28:41","date_gmt":"2024-08-14T15:28:41","guid":{"rendered":"https:\/\/ami.mr\/en\/?page_id=18610"},"modified":"2026-10-14T11:06:28","modified_gmt":"2026-10-14T11:06:28","slug":"mamoudou-mamadou-niang","status":"publish","type":"page","link":"https:\/\/ami.mr\/en\/mamoudou-mamadou-niang","title":{"rendered":"Mamoudou Mamadou Niang &#8211;  Minister of Real Estate, State Property and Land Reform"},"content":{"rendered":"<h3 style=\"text-align: center;\"><strong>BIOGRAPHY<\/strong><\/h3>\n<p><img decoding=\"async\" class=\"size-medium wp-image-18622 alignright\" src=\"https:\/\/ami.mr\/en\/wp-content\/uploads\/2024\/08\/Niang-300x239.jpeg\" alt=\"\" width=\"300\" height=\"239\" srcset=\"https:\/\/ami.mr\/en\/wp-content\/uploads\/2024\/08\/Niang-300x239.jpeg 300w, https:\/\/ami.mr\/en\/wp-content\/uploads\/2024\/08\/Niang-1024x817.jpeg 1024w, https:\/\/ami.mr\/en\/wp-content\/uploads\/2024\/08\/Niang-768x613.jpeg 768w, https:\/\/ami.mr\/en\/wp-content\/uploads\/2024\/08\/Niang.jpeg 1080w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Full Name: NIANG MAMOUDOU<\/p>\n<p>Occupation: Civil Engineer<\/p>\n<p>Date of Birth: 1962<\/p>\n<p>Nationality: Mauritanian<\/p>\n<p>October 10, 2026: Reappointed as Minister of Real\u00a0 Estate, State Property, and Land Reform.<\/p>\n<p>September 18, 2025: Appointed Minister of Real\u00a0 Estate, State Property, and Land Reform.<\/p>\n<p>August 6, 2024: Appointed Minister of Housing, Urban Planning, and Land Use Planning.<\/p>\n<p>July 4, 2023: Appointed Minister of Higher Education and Scientific Research.<\/p>\n<p>2006\u20132022: Member of the National Assembly (three terms).<\/p>\n<p>2009\u20132011: Deputy Speaker of the National Assembly.<\/p>\n<p>&nbsp;<\/p>\n<h4><strong>Key Qualifications:<\/strong><\/h4>\n<p>Design and implementation of road projects<\/p>\n<p>Development of hydro-agricultural infrastructure.<\/p>\n<p>Crossings and engineering structures<\/p>\n<p>Geotechnical studies and investigations<\/p>\n<p>Supervision of the execution of development works.<\/p>\n<p>Preparation of road maintenance work programs<\/p>\n<p>&nbsp;<\/p>\n<h4><strong>Education:<\/strong><\/h4>\n<p>1970\u20131976: Elementary school in Maghama<\/p>\n<p>1976\u20131979: Middle school in Bogh\u00e9.<\/p>\n<p>1979\u20131983: Secondary school (middle school) in Bogh\u00e9.<\/p>\n<p>1979\u20131983: Secondary school (high school) in Rosso<\/p>\n<p>1983\u20131987: Higher education at ENSTP (National School of Public Works in Yamoussoukro).<\/p>\n<p>Civil Engineer specializing in roads<\/p>\n<p>&nbsp;<\/p>\n<h4><strong>Professional Experience:<\/strong><\/h4>\n<p>1986: Internship \u2013 Ivory Coast<\/p>\n<p>Project: Reinforcement of the Bouafi\u00e9\u2013Dalao Road<\/p>\n<p>1986: Internship \u2013 Ivory Coast<\/p>\n<p>Project: Reinforcement of the Bouafi\u00e9\u2013Dalao Road<\/p>\n<p>&nbsp;<\/p>\n<p>Responsibilities: Identification and classification of materials from borrow pits for the base course.<\/p>\n<p>Tests on the base course (compaction, CBR)<\/p>\n<p>Tests on the cement-stabilized base course\u2026<\/p>\n<p>Tests on aggregates for the asphalt mix (sand and gravel).<\/p>\n<p>1987: Final-year project \u2013 Ivory Coast.<\/p>\n<p>Scope:\u00a0\u00a0 Trans-African coastal highway connecting Nouakchott and Libreville via the Ivory Coast, SAN PEDRO section: 16 km<\/p>\n<p>Responsibilities: &#8211; Determination of the horizontal alignment and longitudinal profile.<\/p>\n<p>Design of structures and cross-sections. \u2013 Cost estimation.<\/p>\n<p>Construction schedule.<\/p>\n<p>Mauritania:<\/p>\n<p>1988\u20131989: SODESE; Client: Nouadhibou City Hall<\/p>\n<p>Scope: Supervision of road construction works in Nouadhibou<\/p>\n<p>Responsibilities: Calculation of volumes<\/p>\n<p>Cost estimation<\/p>\n<p>1991\u20131993: SODESE \u2013 GERSAR; Client: SONADER<\/p>\n<p>Scope: \u2013 Execution of work on 22 structures, 4 projects, and 6 km of flood control embankments (Ka\u00e9di-Gouraye projects) \u2013 Funding: AfDB.<\/p>\n<p>Responsibilities: -Expert assessment, review of studies, detailed design (APD), and construction supervision<\/p>\n<p>-Verification of construction drawings and calculation notes<\/p>\n<p>-Verification of materials for concrete and embankments<\/p>\n<p>-Volume calculations and quantity surveys for structures<\/p>\n<p>\u2013 Verification of final accounts<\/p>\n<p>1993\u20131995: SODESE \u2013 SABOUR. For the Ministry of Public Works<\/p>\n<p>&nbsp;<\/p>\n<p>Project: -Nouakchott\u2013Akjoujt\u2013Atar Highway.<\/p>\n<p>Responsibilities: -Laboratory team leader responsible for conducting tests on the test site and identifying the various levels of deterioration of the existing road between A<\/p>\n<p>&nbsp;<\/p>\n<p>1995\u20132016: SCET \u2013 RIM<\/p>\n<p>Scope: -Implementation of the Maghama III hydro-agricultural project: 776 ha and construction of a 13-km levee in Wali \u2013 Funding: IDB<\/p>\n<p>Responsibilities:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u2013 Project Manager for construction supervision<\/p>\n<p>-Verification of construction drawings and quantity surveys for structures<\/p>\n<p>-Preparation of daily reports<\/p>\n<p>-Preparation of final accounts<\/p>\n<p>Scope:<\/p>\n<p>-Design studies for the Maghama WOMPOU access improvement works and a dike\u00a0 Funding: AfDB.<\/p>\n<p>-Project Manager for Preliminary Design (APD) and Detailed Design (DAO) Studies<\/p>\n<p>Responsibilities:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 -Verification of design studies<\/p>\n<p>\u2013 Design of the levee and access road<\/p>\n<p>\u2013 Design of structural elements \u2013 Stability calculations<\/p>\n<p>\u2013 Reinforcement calculations<\/p>\n<p>\u2013 Structural drawings and bill of quantities<\/p>\n<p>\u2013 Preparation of contract documents (Technical Specifications, Project Description)<\/p>\n<p>&nbsp;<\/p>\n<p>Scope: \u2013 Design studies for the Maghama Fimbo access improvement projects and a 5-km embankment-road. Coordinator of the Preliminary Design (APD) and Detailed Design (DAO) studies. Funding: AfDB.<\/p>\n<p>-Project Manager<\/p>\n<p>Responsibilities: \u2013 Review of design studies<\/p>\n<p>\u2013 Design of the embankment and access road<\/p>\n<p>\u2013 Design of structural elements \u2013 Stability analysis<\/p>\n<p>\u2013 Reinforcement calculations<\/p>\n<p>\u2013 Structural drawings and bill of quantities<\/p>\n<p>\u2013 Preparation of contract documents (Specifications, Descriptive Report)<\/p>\n<p>\u2013 Supervision of construction work<\/p>\n<p>&nbsp;<\/p>\n<p>Scope:\u00a0 \u2013 Design and Supervision of Construction Work for Hydraulic Structures in Oasis Areas: Project Manager: Oasis Development Project \u2013 Funding: FADES-IFAD-RIM<\/p>\n<p>Responsibilities: \u2013 Project Manager for Construction Supervision<\/p>\n<p>\u2013 Topographic surveys<\/p>\n<p>\u2013 Hydraulic studies (hydraulic sizing and recalibration of structures)<\/p>\n<p>\u2013 Geotechnical investigations and identification of borrow areas<\/p>\n<p>\u2013 Preparation of preliminary design (APS), detailed design (APD), and construction drawings (DAO)<\/p>\n<p>Scope: Design and supervision of construction work for 10 small dams in HODH EL GHARBI in a joint venture with CES \u2013 Funding: KfW<\/p>\n<p>Responsibilities: \u2013 Project Manager for Supervision<\/p>\n<p>\u2013 Geotechnical investigations and identification of borrow areas<\/p>\n<p>\u2013 Review and verification of topographic surveys<\/p>\n<p>\u2013 Study of watersheds and engineering structures<\/p>\n<p>Subject: Design and supervision of construction work on small dams in the HODHS \u2013 AEMP \u2013 Funding: U.S.<\/p>\n<p>Responsible: -Project Manager<\/p>\n<p>&nbsp;<\/p>\n<p>-Preliminary Design (APS), Detailed Design (APD)<\/p>\n<p>-Geotechnical Study<\/p>\n<p>-Preparation of Construction Drawings (DAO)<\/p>\n<p>-Construction Supervision<\/p>\n<p>2005\u20132007<\/p>\n<p>Subject: Supervision of construction work for Lot 2 of the ROSSO BOGHE paved road<\/p>\n<p>Funding: AfDB \/ Government<\/p>\n<p>Department of Public Works<\/p>\n<p>Responsibilities: Project Manager for the technical and administrative supervision and oversight of all project components, namely:<\/p>\n<p>&nbsp;<\/p>\n<p>-Construction of hydraulic structures (culverts and foundation slabs)<\/p>\n<p>-Quality control and oversight of construction material usage.<\/p>\n<p>-Management of human and material resources assigned to the project.<\/p>\n<p>-Preparation of monitoring reports and progress reports on the execution of the work.<\/p>\n<p>-Verification of invoices and monitoring of the financial execution of the contract<\/p>\n<p>2007\u20132010<\/p>\n<p>Subject: Supervision of construction work on Lot 2 of the Ka\u00e9di\u2013M\u2019Bout\u2013Seilibaby\u2013Gouraye Road (two-layer pavement + 2 bridges between Seilibaby and Gouraye and 6 bridges between M\u2019Bout and Seilibaby)<\/p>\n<p>Lot Manager<\/p>\n<p>Funding: EU \/ Government<\/p>\n<p>Transportation Infrastructure Directorate<\/p>\n<p>Responsibilities: Deputy Project Manager and Lot 2 Manager for the technical and administrative oversight and supervision of all project components, namely:<\/p>\n<p>&#8211; Construction of bridges and hydraulic structures (culverts and foundation slabs)<\/p>\n<p>&#8211; Quality control and monitoring of construction material usage.<\/p>\n<p>&#8211; Management of human and material resources assigned to the project.<\/p>\n<p>&#8211; Preparation of monitoring sheets and progress reports on the execution of the work.<\/p>\n<p>&#8211; Verification of invoices and monitoring of the financial execution of the contract<\/p>\n<p>2010\u20132013<\/p>\n<p>Purpose: Supervision of construction work on Lot 1 of the Ka\u00e9di\u2013M\u2019Bout\u2013Seilibaby\u2013Gouraye Road (paved road between Ka\u00e9di and M\u2019Bout, including 6 bridges\u20142 of which span the Grogol River\u2014and the Foum Gleita ramp)<\/p>\n<p>Project Manager<\/p>\n<p>Funding: EU \/ Government<\/p>\n<p>Transportation Infrastructure Directorate<\/p>\n<p>Responsibilities: Project Manager responsible for the technical and administrative oversight and supervision of all project components, namely:<\/p>\n<p>&#8211; Construction of bridges and hydraulic structures (culverts and foundation slabs)<\/p>\n<p>&#8211; Quality control and monitoring of construction material usage.<\/p>\n<p>&#8211; Management of human and material resources assigned to the project.<\/p>\n<p>&#8211; Preparation of monitoring reports and progress reports on the execution of the work.<\/p>\n<p>&#8211; Verification of invoices and monitoring of the financial execution of the contract<\/p>\n<p>2013\u20132014<\/p>\n<p>Subject: Supervision of construction work on Lot 3 of the Ka\u00e9di\u2013M\u2019Bout\u2013Seilibaby\u2013Gouraye Road (paved road between Mbout and Selibaby)<\/p>\n<p>Project Manager<\/p>\n<p>Government Funding<\/p>\n<p>Transportation Infrastructure Directorate<\/p>\n<p>Responsibilities: Project Manager responsible for the technical and administrative oversight and supervision of all project components, namely:<\/p>\n<p>&#8211; Construction of hydraulic structures (culverts and foundation slabs)<\/p>\n<p>&#8211; Quality control and monitoring of construction material usage.<\/p>\n<p>&#8211; Management of human and material resources assigned to the project.<\/p>\n<p>&#8211; Preparation of monitoring sheets and progress reports on the execution of the work.<\/p>\n<p>&#8211; Verification of invoices and monitoring of the financial execution of the contract<\/p>\n<p>2014\u20132016<\/p>\n<p>Subject: Supervision of construction work on Lot 1 of the Nema\u2013Bangou paved road<\/p>\n<p>Funding: IDB\u2013Kuwait Fund\u2013Government<\/p>\n<p>Transportation Infrastructure Directorate<\/p>\n<p>Responsibilities: Project Manager responsible for the technical and administrative supervision and oversight of all project components, namely:<\/p>\n<p>&#8211; Construction of hydraulic structures (culverts and foundation slabs)<\/p>\n<p>&#8211; Quality control and oversight of the use of construction materials.<\/p>\n<p>&#8211; Management of human and material resources assigned to the project.<\/p>\n<p>&#8211; Preparation of monitoring sheets and progress reports on the execution of the work.<\/p>\n<p>&#8211; Verification of invoices and monitoring of the financial execution of the contract<\/p>\n<p>2016\u20132017<\/p>\n<p>Subject: Supervision of construction work on Lot 1 of the Nouakchott\u2013Bombri paved road<\/p>\n<p>Funding: Government<\/p>\n<p>National Public Works Laboratory (LNTP)<\/p>\n<p>Responsibilities: Project Manager responsible for the technical and administrative oversight and supervision of all project components, namely:<\/p>\n<p>&#8211; Construction of hydraulic structures<\/p>\n<p>&nbsp;<\/p>\n<p>&#8211; Quality control and monitoring of construction material usage<\/p>\n<p>&#8211; Management of human and material resources allocated to the project<\/p>\n<p>&#8211; Preparation of monitoring reports and progress reports on the execution of the work<\/p>\n<p>&#8211; Verification of invoices and monitoring of the financial execution of the contract<\/p>\n<p>2006\u2013present MEMBER OF THE NATIONAL ASSEMBLY OF MAURITANIA (3 terms)<\/p>\n<p>2009\u20132011: Four Vice Presidents of the National Assembly, MAURITANIA<\/p>\n<p>2017\u2013present: Rosso Bridge Management Unit: Lead Civil Engineer:<\/p>\n<p>&#8211; Preparation of terms of reference for calls for expressions of interest<\/p>\n<p>\u2013 preparation of requests for proposals for contractors and supervision and inspection firms<\/p>\n<p>-preparation of terms of reference for technical audits<\/p>\n<p>-participation in the evaluation of bids from contractors and supervision and inspection firms<\/p>\n<p>\u2013 monitoring of services provided by inspection firms<\/p>\n<p>Languages:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Read\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Spoken\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Written<\/p>\n<p>Arabic:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Fair\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Fair\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Fair<\/p>\n<p>&nbsp;<\/p>\n<p>French:\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 Excellent\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0Excellent\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0Excellent<\/p>\n<p>&nbsp;<\/p>\n<p>English:\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0Fair\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0Fair\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0Fair<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h4><\/h4>\n","protected":false},"excerpt":{"rendered":"<p>BIOGRAPHY Full Name: NIANG MAMOUDOU Occupation: Civil Engineer Date of Birth: 1962 Nationality: Mauritanian October 10, 2026: Reappointed as Minister of Real\u00a0 Estate, State Property, and Land Reform. September 18, 2025: Appointed Minister of Real\u00a0 Estate, State Property, and Land Reform. August 6, 2024: Appointed Minister of Housing, Urban Planning, and Land Use Planning. July [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-18610","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/ami.mr\/en\/wp-json\/wp\/v2\/pages\/18610","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ami.mr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ami.mr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ami.mr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ami.mr\/en\/wp-json\/wp\/v2\/comments?post=18610"}],"version-history":[{"count":2,"href":"https:\/\/ami.mr\/en\/wp-json\/wp\/v2\/pages\/18610\/revisions"}],"predecessor-version":[{"id":33968,"href":"https:\/\/ami.mr\/en\/wp-json\/wp\/v2\/pages\/18610\/revisions\/33968"}],"wp:attachment":[{"href":"https:\/\/ami.mr\/en\/wp-json\/wp\/v2\/media?parent=18610"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}